Technical notes

Preparing AS9102 Form 3: a practical sequence

Organise characteristic accountability before entering measured results.

Reviewed 1 October 2026

1. Confirm the applicable requirements

Identify the part, drawing or model revision, applicable standard edition and customer instructions. Use the controlled form and guidance required by your organisation. This sequence is an operational guide, not a reproduction of the standard or a substitute for it.

2. Build a complete characteristic inventory

Review the model and any controlling drawings or notes. Assign an identifier that connects each characteristic to its source. Check for requirements that a CAD export may omit. Ballooning makes the relationship easier to review; it does not establish that the inventory is complete.

3. Review the requirement text

Preserve nominal values, units, tolerance limits and relevant datum references. Do not substitute a rounded display value for a source requirement. Resolve unsupported or ambiguous PMI before it becomes an inspection instruction.

4. Add the inspection evidence

Record the required measured results and supporting information through the approved inspection process. Keep preparation fields separate from actual results. Where a requirement has not been measured, do not fill the result with a nominal value merely to complete the form.

5. Review and approve the record

Reconcile every characteristic with its source and evidence. Resolve discrepancies through the required nonconformance process. Confirm the revision identity and required signatures before release.

Where PartDatum fits

PartDatum prepares supported characteristic information and exports Form 3 data in XLSX/PDF. Inspect the exported file against your controlled form and customer instructions. The software does not complete a physical inspection or approve the resulting FAI.

Sources and further reading