In a revision review
A software-generated form is only part of the inspection evidence.
Related workflow
Use the glossary to interpret the review record. The applicable drawing, contract and standard remain the authority for acceptance.
Engineering glossary
The aerospace first article inspection standard defines requirements for documenting verification of a representative production article. The contract determines the applicable edition and additional customer requirements.
Reviewed 1 October 2026
A software-generated form is only part of the inspection evidence.
Use the glossary to interpret the review record. The applicable drawing, contract and standard remain the authority for acceptance.