In a revision review
Balloon numbers identify requirements, not successful measurements.
Related workflow
Use the glossary to interpret the review record. The applicable drawing, contract and standard remain the authority for acceptance.
Engineering glossary
Assigning visible identifiers to inspection characteristics so a reviewer can connect the model or drawing with the inspection list.
Reviewed 1 October 2026
Balloon numbers identify requirements, not successful measurements.
Use the glossary to interpret the review record. The applicable drawing, contract and standard remain the authority for acceptance.