In a revision review
Do not alphabetically sort datum references during a comparison.
Related workflow
Use the glossary to interpret the review record. The applicable drawing, contract and standard remain the authority for acceptance.
Engineering glossary
A datum reference frame establishes the reference system for interpreting specified geometric controls. Reordering referenced datums can change the meaning of the requirement.
Reviewed 1 October 2026
Do not alphabetically sort datum references during a comparison.
Use the glossary to interpret the review record. The applicable drawing, contract and standard remain the authority for acceptance.